Zapri iskalnik

GAINN4MOS

Connecting Europe Facility
URL: http://www.gainnprojects.eu/?gainn4type=gainn4mos

The Action, is co-financed by the European Union, was selected at the first call of the  Connecting Europe Facility program. The Action involves preparation of engineering studies and plans, as well as construction drawings of 4 LNG retrofitted prototype vessels, and 7 LNG bunkering stations at core ports (5 prototype stations in Koper, Genova, La Spezia, Livorno, Venezia, and 2 fully operational LNG break-bulking stations in Nantes-St Nazaire, and FosMarseille). The Action is coordinated by Fundacion Valenciaport. The Action will be implemented from the 1st of May 2015 till the 30th of September 2019.

URL: http://www.gainnprojects.eu/?gainn4type=gainn4mos

Projekt, ki ga sofinancira Evropska unija, je bil izbran na prve razpisu Instrumenta za povezovanje Evrope. Rezultat projekta bodo študije in projekti za naknadno vgradnjo pogonskih sistemov na utekočinjen zemeljski plin (UZP) na 4 plovilih, projekti za izgradnjo 7 polnilnic na UZP in sicer v pristaniščih Koper, Genova, La Spezia, Livorno, Benetke, Fos-Marseille in Nantes-Saint Nazair. Projekt koordinira Fundacion Valenciaport. Projekt bo trajal od 1.5.2015 do 30.9.2019